SIMTEK EMS · SERVICE DATA SHEET DOC NO. SW-009 · SHEET 09 OF 17 · REV A

// SVC-07 / NPI

New product introduction

From first prototype to controlled volume ramp: DFM review before anything is built, first articles with proper documentation, and a production process proven before you commit.

Engineer reviewing technical drawings during new product introduction
FIG. 1: DESIGN REVIEWDFM / FAI / PPAP

01 / Capability

Getting to production without surprises

New product introduction is where cost, yield and reliability are decided. Our engineers review your design for manufacture and test before the first board is placed, flag component risks through procurement, and build first articles under the same controlled process that will run production.

  • Design for manufacture (DFM) and design for test (DFT) review
  • Prototype and pilot builds on production equipment
  • First article inspection (FAI) and PPAP-style documentation
  • Engineering change control from first build onward
  • Production engineering support through ramp and beyond

02 / Medical & regulated work

Design transfer, done properly

For medical devices, NPI means design transfer under ISO 13485: documented, verified, and ready for your regulatory submission. We work alongside your engineers to establish validated, repeatable processes, so scaling from pilot to production doesn't reopen questions your notified body has already closed. Prototype-to-volume support is also the story consumer OEMs consistently praise us for.

03 / RFQ

Discuss your requirement

Send your BOM, Gerbers or drawings for a detailed quotation, or just describe the product and we'll take it from there.

Request a quote