// Medical / ISO 13485
ISO 13485 certified contract manufacture of medical electronics: PCB assembly (PCBA), box build and finished devices, with the documentation and traceability your regulatory file depends on.
01 / Why it matters
Choosing a medical device contract manufacturer is a regulatory decision as much as a commercial one. Your notified body, your customers and the MHRA all expect your supply chain to stand up to scrutiny. That's why manufacture under a certified ISO 13485 quality management system is the entry requirement, not a nice-to-have.
Simtek EMS has held ISO 13485 certification alongside ISO 9001 for years, with two decades of medical electronics manufacture behind it. Supplier audits are routine here: our systems, records and floor are ready for inspection, and UK-based manufacture means your quality team can audit us in a morning, not a time zone.
02 / Capability
Everything runs under the same certified system on one site, with no sub-contract handoffs and no divided responsibility when a question needs answering.
03 / Design transfer
Moving a device from design into manufacture is where regulatory risk concentrates. Our NPI process supports design transfer under ISO 13485: design-for-manufacture review before first build, first article inspection with documentation your notified body will recognise, validated repeatable processes, and controlled engineering change from the first unit onward.
Component risk is managed from day one by our in-house procurement team: franchised-channel sourcing for counterfeit avoidance, obsolescence monitoring across your BOM, and lifetime buys managed on your behalf. For devices with long regulatory lifecycles, that supply chain discipline is what keeps an approved product manufacturable for years.
04 / FAQ
Yes. ISO 13485:2016 alongside ISO 9001:2015, with certificates available on request. See our quality page for the full framework.
Yes. DFM review, first article inspection, process documentation and controlled engineering change are all part of our standard NPI process for medical work.
Yes. Build, test and material records are maintained per batch, and per unit where your device requires it, supporting your DHR and audit trail.
Low-to-medium volume, high-mix production: from prototype and design-transfer batches through to ongoing scheduled manufacture.
05 / RFQ
Send your BOM, drawings or just a description of the product and its regulatory route, and we'll come back with a straight view on manufacturability, documentation and cost.